Where it is
Links Gurugram (from around Brig Osman Chowk) east via Gwal Pahari to Badkhal and Faridabad. The plan calls it a State Highway; a press report calls it MDR-137.
The planned Namo Bharat corridor along part of it is to be executed by the National Capital Region Transport Corporation (NCRTC) (as reported).
Plan position
The Gurugram-Manesar Final Development Plan 2031 proposes a 90 m road link from Andheria Mor in Delhi to the Gurgaon–Faridabad road via Mandi and Gual Pahari, and a 60 m V-2 road from Sector 54 extended up to the Gurgaon–Faridabad road.
Official plan · Our note on the plan
Roads, rail and metro
| Gurugram–Faridabad–Noida Namo Bharat (RRTS-cum-metro) | approved Final alignment approved 24 Feb 2026; about 64 km, 52 km in Haryana; Gurugram section IFFCO Chowk–Gwal Pahari about 14.5 km; construction expected to start Dec 2026 (as reported). Source |
|---|---|
| DPR, Gurugram–Faridabad–Noida corridor | proposed NCRTC completed the DPR, about Rs 15,000 crore; alignment runs past Gwal Pahari along the Faridabad–Gurugram road to Badkhal and Bata Chowk (as reported, 8 Dec 2025). Source |
Questions worth asking about land along it
- Does the parcel actually touch the road, or a service road, a green belt or a sector road shown on the plan?
- Is any part of it inside land acquired or proposed for the road, a junction or a toll plaza?
- Is it inside a notified TOD zone, and does that change what can be built?
- Which village and tehsil is it in? The collector rate goes by village, not by road.
Properties here
No public listings here at the moment. Many requirements are matched privately: share your brief or offer a property.