Places

Gurugram–Faridabad road

Haryana approved the 64 km Gurugram–Faridabad–Noida Namo Bharat alignment on 24 Feb 2026; part of it runs along the Gurugram–Faridabad road.

Corridor

Where it is

Links Gurugram (from around Brig Osman Chowk) east via Gwal Pahari to Badkhal and Faridabad. The plan calls it a State Highway; a press report calls it MDR-137.

The planned Namo Bharat corridor along part of it is to be executed by the National Capital Region Transport Corporation (NCRTC) (as reported).

Plan position

The Gurugram-Manesar Final Development Plan 2031 proposes a 90 m road link from Andheria Mor in Delhi to the Gurgaon–Faridabad road via Mandi and Gual Pahari, and a 60 m V-2 road from Sector 54 extended up to the Gurgaon–Faridabad road.

Official plan · Our note on the plan

Roads, rail and metro

Gurugram–Faridabad–Noida Namo Bharat (RRTS-cum-metro)approved
Final alignment approved 24 Feb 2026; about 64 km, 52 km in Haryana; Gurugram section IFFCO Chowk–Gwal Pahari about 14.5 km; construction expected to start Dec 2026 (as reported). Source
DPR, Gurugram–Faridabad–Noida corridorproposed
NCRTC completed the DPR, about Rs 15,000 crore; alignment runs past Gwal Pahari along the Faridabad–Gurugram road to Badkhal and Bata Chowk (as reported, 8 Dec 2025). Source

Questions worth asking about land along it

  • Does the parcel actually touch the road, or a service road, a green belt or a sector road shown on the plan?
  • Is any part of it inside land acquired or proposed for the road, a junction or a toll plaza?
  • Is it inside a notified TOD zone, and does that change what can be built?
  • Which village and tehsil is it in? The collector rate goes by village, not by road.

Properties here

No public listings here at the moment. Many requirements are matched privately: share your brief or offer a property.